Request a Quote
Use the quote form to send your BOM, gerbers, CPL, and other production files. Engineering reviews and replies within one business day.
Request a QuoteContact
For RFQs, send files through our quote form. For technical questions, email engineering directly.
Use the quote form to send your BOM, gerbers, CPL, and other production files. Engineering reviews and replies within one business day.
Request a QuoteFor technical questions, capability discussions, or DFM reviews:
NDA available on request before file exchange.
Vasko Stamboliev
Janko Cvetinov 13
Strumica, North Macedonia
Gerber RS-274X, ODB++, and IPC-2581 for PCB data. BOM in xlsx or csv with manufacturer part numbers. CPL or pick-and-place file in csv or txt. Step files for enclosures. Firmware binaries as hex, bin, or signed image bundles.
No fixed minimum. We run NPI pilots from a single unit through recurring production into the tens of thousands per year. Single-shift line capacity is approximately 4.8 million component placements per year; programmes above that level we plan jointly across multiple shifts during DFM and BOM review.
New product introduction takes about 4 to 8 weeks depending on component availability and test fixture readiness. Repeat batches typically run on a 3 to 5 week cadence once tooling and test plan are in place.
Yes. We work from your approved vendor list (AVL) or build one with you, including dual-source identification for lead-time risk. We flag obsolete or long-lead parts during DFM review and propose alternates when needed.
Shorter lead times to EU customers, faster engineering communication during a product change, EU regulatory alignment (CE, RED, CRA, GDPR posture), and reduced supply-chain distance for spare component runs.
The quote form is structured to capture what we need to scope production correctly the first time.